Pellwick Surveying
Roof inspection report
14 Orchard Lane
01 At a glance
- 3Urgent1
- 2Repair needed2
- 1No repair2
- NINot inspected1
- 3
- Urgent. Defects that are serious or need urgent repair, replacement or further investigation.
- 2
- Repair needed. Defects that need repairing or replacing but are not serious or urgent.
- 1
- No repair. No repair is currently needed. Normal maintenance applies.
- NI
- Not inspected. The notes say why.
02 What was inspected, and the limits
The roofs were inspected on 2 October 2026 in dry, overcast weather. The main roof was seen from the ground and from a ladder at the rear eaves; the flat roof over the rear extension was seen from a ladder at its edge, without walking on it. The roof space over the main house was entered from the loft hatch.
The inspection was limited to the parts that could be seen and safely reached on the day. No coverings were lifted and nothing was opened up. The report describes the condition seen on the day; it cannot rule out defects that were hidden, out of reach or that develop later.
03 The roof, part by part
Roof coverings: rear extension flat roof
Mineral felt on a timber deck. Area: not recorded, to confirm.
Flat roof · split at the outlet
A split about the width of a hand runs through the felt beside the rainwater outlet in the north-east corner, and water is standing around the outlet. Staining on the kitchen ceiling below was reported by the owner. If left, water may continue to get into the deck and the ceiling below. The split and the deck around the outlet should be investigated and repaired, and the outlet cleared.
Priority 1 · Now, or within 12 months · Investigate and repair at the outlet
Roof coverings: main roof
Concrete interlocking tiles, pitched, with a ridge and hips.
Main roof · slipped tiles
Two tiles have slipped on the rear slope above the rear bedroom window, leaving a gap in the covering. Elsewhere the tiles appear sound. If left, rain may get past the gap and damage the battens and the roof space below. The slipped tiles should be refixed and the battens around them checked.
Priority 2 · Within 1 to 2 years · Refix slipped tiles
Chimney stacks
One brick stack on the party wall, two pots.
Chimney stack · cracked flaunching
The flaunching (the mortar bed round the pots) is cracked, and several mortar joints near the top of the stack are open. If left, frost and rain may loosen the pots and the top courses of brick. The flaunching should be renewed and the open joints repointed.
Priority 2 · Within 1 to 2 years · Renew flaunching and repoint
Rainwater pipes and gutters
Plastic half-round gutters and round downpipes.
Rear gutter · moss and leaves
The gutters and pipes are in fair condition with no leaking joints seen. Moss and leaves have gathered in the rear gutter at its outlet. The gutters should be cleared as part of routine maintenance.
Priority 4 · Planned maintenance · Clear the rear gutter
Roof structure: main roof
Timber rafters and purlins, seen from the loft hatch.
The rafters, purlins and roofing felt seen from the hatch appear in good condition, with no sagging, splits or staining seen. Insulation is laid between the ceiling joists. No action is needed beyond routine checks.
Roof structure: rear extension
Not inspected.
There is no access hatch to the space over the extension, so its structure could not be seen. It should be checked from below when the flat roof is opened up for the repair at the outlet.
04 Recommended actions, most urgent first
- Investigate and repair the split in the felt at the rear extension's outlet, check the deck around it and clear the outlet. Flat roof · Priority 1, now or within 12 months
- Refix the two slipped tiles above the rear bedroom window and check the battens. Main roof · Priority 2, within 1 to 2 years
- Renew the cracked flaunching and repoint the open joints at the top of the stack. Chimney · Priority 2, within 1 to 2 years
- Check the extension's roof structure from below while the flat roof repair is under way. Rear extension · with action 1
- Clear the rear gutter and its outlet. Gutters · Priority 4, planned maintenance